Johnson Matthey Skopje Catalyst Plant Phase I and II projects consist of 29,300m² indoor space. The 3x2,500kVA + 4x3,000kVA medium-voltage switchgear and transformer substation, 1,100kVA + 900kVA diesel generator distribution installation, 300kVA + 160kVA + 40kVA uninterruptible power supply (UPS) distribution systems, low-voltage and weak-current systems were engineered by our company.